Home>>
New pumped-storage hydropower station in east China begins construction
(Xinhua) 09:10, March 18, 2022
HANGZHOU, March 17 (Xinhua) -- Construction of a new pumped-storage hydropower station project started in east China's Zhejiang Province Thursday, said the State Grid Zhejiang Electric Power Co., Ltd.
The hydropower station in Taishun County, Wenzhou City has an installed capacity of 1.2 million kilowatts. It is expected to be put into use by 2028, with an investment of 7.13 billion yuan (about 1.12 billion U.S. dollars).
So far, there are four pumped-storage hydropower stations operational in Zhejiang with a total installed capacity of 4.58 million kilowatts. Six such stations are still under construction.
(Web editor: Xia Peiyao, Liang Jun)
Photos
Related Stories
- Technology-powered hiking jacket industry brings wealth to county in Zhejiang
- China's Zhejiang vows to expand middle-income group
- China intensifies efforts to promote prefabricated construction
- China's Zhejiang reports 22 locally transmitted COVID-19 cases
- Manufacturing enterprises in Zhejiang benefit from digital transformation
About People's Daily Online | Join Us | Contact Us
Copyright © 2022 People's Daily Online. All Rights Reserved.
Copyright © 2022 People's Daily Online. All Rights Reserved.